< Zoning Permit

Property Information

Contractor(s)

Project Information

Fee Section:

For a Fence Permit, enter the linear feet in the box below.
For a Shed or Deck Permit, enter 30 below.
Separate permits are required for electrical, plumbing, heating, ventilation or air conditioning. This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provision of any other state or local law regulating construction or the performance of construction.

Uploaded Plot Plans are Required

Upload Files: